Be sure to install them with this side facing outward.
Cedar shingle siding installation guide.
Install the felt paper with minimum 6 inch overlaps on vertical joints 2 inches on horizontal laps and 4 inches wrapped each way at inside and outside corners.
In areas with harsh climactic conditions the lath or the cedar breather must be underside by foam or a rigid insulator.
Shingles have one side that is smoother and more uniform than the other.
Continue installing full panels using the specified fasteners nailing pattern and gapping instructions.
Use two nails per shingle.
Storage store the shingle siding in an unheated dry and ventilated area.
Underlayment requirements for wood shingles the cedar shake and shingle bureau recommends installation over type 30 asphalt felt underlayment for red cedar shingles and shakes.
If using square edge trim leave the proper gap for caulking as recommended by the caulking manufacturer.
Fasten the panel with the specified siding nails 1 2 above each keyway and 1 2 to 1 from each panel edge.
Factory stained white cedar individual shingles can only be installed to exterior wall surfaces.
Attach the shingles with 1 inch roofing nails.
It can also be butted against adjoining walls with a trim strip used to cover the joint.
When you come to the last space in a row use a utility knife to cut a shingle to fit into it.
To align the shingles tack a board temporarily to the roof or draw a straight chalk line.
Lac e 2 34 2 cm nails from each edge of the shingle and 112 4 cm nails above the exposure.
Leave shingle boxes on pallet.
Always apply primer or stain end cuts.
Eastern white cedar shingles before installing your maibec shingles carefully read the installation guide completely to understand the correct steps and precautions to take to ensure.
As in the above illustration at inside corners siding is frequently butted against a 2 x 2 trim strip.